STEAM TURBINE GENERATOR
SHIN NIHON ZOKI , JAPAN
7900KW 2001 50HZ 6600VOLT
CONSISTING OF
NO.1 STEAM TURBINE PART
NO.2 ALTONATOR PART
NO.3 VACUUM PUMP
NO.4 HYDRALIC UNIT
NO.5 ACCESSORIES
NO.6 CHILLER FOR HYDRALIC UNIT
NO.7 TURBINE ROTOR BEAM, AND ACCESSORY
NO.8 STEEL FRAME, PIPING UNITS ETC.
NO.9 CONTROL UNIT.
HISTORY OF MAINTENANCE
HOUR METER ABT.47000 HOURS
FINAL MAINTNANE WAS 2007 AUG.
AFTER LAST OVERHAULED ABT. 25000 HOURS, TILL END OF
DEC. 2012